General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

New - General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.

Expected Fee

$120

Estimated Processing Time

12 Months

  1. Submit complete General NPDES Permit Form for Discharge of Treated Storm Water

Brad Barzin
Oil Control Program - AST & Permits Division
[email protected]
(410) 537-3442

Start Application

Renew - General NPDES Permit: Discharge of Stormwater and Hydrostatic Test Water from Oil Terminals - OGT

This general permit covers the following discharges to surface water or groundwater of the State: 1. All new and existing discharges of stormwater from storage tank dikes (i.e. secondary containment dikes) and loading rack areas and 2. All new and existing discharges of hydrostatic test water from oil terminals.

Expected Fee

$120

Estimated Processing Time

12 Months

  1. Submit complete General NPDES Permit Form for Discharge of Treated Storm Water

Brad Barzin
Oil Control Program - AST & Permits Division